Lumivue Display Systems — Holographic, rail & transparent display systems373807126@qq.com  |  Request a quote  |  EN / GLOBAL SUPPLY

Installation & Maintenance Checklist

Power, ventilation, glass handling, calibration, cleaning and preventive maintenance for interactive showcases.

Before delivery

Confirm floor loading, door widths, lift access, mains voltage and the route from the loading bay to the final position.

At installation

Level the cabinet, secure the fixings, connect the concealed power/data channel, calibrate the panel and balance the internal lighting against the room.

Routine care

Clean glass with a non-abrasive cloth, keep vents clear, check carriage tracks for dust and verify that loops play after a power cycle.

Content updates

Keep a master copy of every loop and record which player and trigger point each asset belongs to before updating content on site.

Where to go next

Browse the full product catalogue, compare the frequently asked questions, or send us the space dimensions for a configuration proposal.

Tell us about your display project

Share the space, the product family and the viewing goal. We will come back with a configuration, indicative specification and a layout proposal.

Request a Quote →
Browse displaysRequest a Quote